Resistance furnace power installation distribution,Industrial furnace heating time requirements1. box-type furnace: furnace door at the installation of 1/3-1/4 power
Distribution of resistance furnace power installation
I. Resistance furnace power installation distribution
1. box-type furnace: furnace door at the installation of 1/3-1/4 power
2. shaft furnace: L / D = number of zones (L: height; D: diameter)
3. continuous furnace: power distribution according to the process curve to determine, but the mouth of the furnace should also increase power
4. Furnace temperature Power distribution
1200 ℃ 15-20Kw/m2
1000 ℃ 10-15 Kw/m2
700 ℃ 6-10 Kw/m2
400 ℃ 4-7 Kw/m2
II. Industrial furnace heating time requirements
1. Periodic furnace
Use of refractory lining Small furnace: 1.5-2 hours
Medium-sized furnace: 2-3 hours
Otherwise, it will make the lining cracked or the lining has not yet absorbed heat, will not radiate heat to the workpiece
Use of fiber lining Small furnace: 1-2 hours
Medium-sized furnace: 1.5-2 hours
2. Continuous furnace: temperature rise rate (Max.) 50 degrees / hour
More Distribution of resistance furnace power installation: en.chengchi.net/view-248.html